Case Studies
-
Wembley Stadium 2004-2007
Timbermat was successfully chosen as the main temporary protection supplier on the site for the whole build period. Read more »
-
M6 Motorway 2008 bridge and junction demolition
A major headache for the contractor who had to demolish and remove two bridges and a junction, over an existing rail line, within 48 hours. Read more »
-
Blackfriars Station London, 2009 -2010
Timbermat were asked to come up with a design solution to enable lightweight and a heavy plant to cross rail lines, protect platforms and underground services. Read more »
-
REG Windpower, Preston
Timbermat supplied REG Windpower with 537 metres of Emtek mats for 12 weeks to complete the build of 2 wind turbines in Preston. Read more »

